Markets Served / Project Experience

44th Street Water Treatment Plant Filter Rehabilitation

Ocean City, Maryland

LocationOcean City, Maryland
MarketWater Treatment Plants

Contract details

Johnston Construction Company — Contract
$2,648,856.58
B & R Electrical Contractors — Contract
$281,637

Team Members

Owner
Town Of Ocean City
Prime Contractor
Johnston Construction Company
Engineer
Whitman, Requardt & Associates, LLP

Key Accomplishments

Johnston Construction Company

  • Installed new ductile-iron filter-face piping and new ductile-iron interconnecting piping between the filters and the existing influent and effluent manifolds.
  • Furnished and installed electrically actuated butterfly valves for filter inlet, outlet, backwash, rinse, tank-drain, air-wash, and air-pressurizing service.
  • Installed manual isolation valves, air-release valves, vent-isolation valves, pressure-gauge assemblies, and drain funnels for the filter systems.
  • Replaced the existing filter-control arrangement with two new stainless-steel control panels serving Filter Banks A and B.
  • Installed Modicon M580 programmable controllers, 12-inch touchscreen operator interfaces, Ethernet communications, redundant power supplies, surge protection, UPS backup, relays, terminal blocks, and related panel components.
  • Coordinated programming for the filter controls and integration of the new panels with the existing plant SCADA system.
  • Installed fourteen magnetic flowmeters serving the individual filter inlets.
  • Installed two magnetic flowmeters serving the common filter-effluent piping.
  • Removed two existing filter air blowers, associated air piping, appurtenances, and concrete equipment pads.
  • Installed two new air blowers with sound enclosures, flexible connections, silencers, relief valves, pressure gauges, motors, check valves, and associated air piping.
  • Constructed new concrete pads for the replacement air-blower equipment.
  • Reused and upgraded existing motor-control-center buckets serving the new blower systems.

B & R Electrical Contractors

  • B & R Electrical Contractors, Inc. performed the electrical construction associated with the rehabilitation of fourteen filters at the 44th Street Water Treatment Plant.
  • Furnished the labor, materials, tools, equipment, and supervision required for the electrical work included in the project drawings, Division 16 specifications, and referenced Gorman Avenue Water Treatment Plant contract documents.
  • Performed electrical demolition of existing conduit, conductors, junction boxes, controls wiring, and equipment connections affected by the filter rehabilitation.
  • Reused existing electrical raceways, conductors, and connections where conditions permitted and replaced or extended them where required for the new filter equipment.
  • Furnished and installed conduit, wiring, boxes, fittings, supports, terminations, and electrical connections for the fourteen rehabilitated filters.
  • Furnished and installed fourteen stainless-steel junction boxes, with one junction box serving the wiring and controls associated with each filter.
  • Installed electrical raceways and conductors serving the new electrically actuated filter valves.
  • Coordinated electrical connections for the replacement filter-control panels serving Filter Banks A and B.
  • Installed power feeds, conduit, wiring, supports, and field terminations between the new control panels and remotely located filter equipment.
  • Coordinated connections for the new filter-inlet and common-effluent magnetic flowmeters where included within BRE’s electrical scope.
  • Reused and upgraded the existing motor-control-center buckets serving the replacement filter air blowers.
  • Installed electrical power and control connections for two new air blowers and associated equipment furnished by others.
  • Coordinated blower wiring with the existing motor-control equipment, replacement control panels, and filter operating sequences.
  • Installed conduit and wiring required for the chlorine-room CCTV improvements.

Project Description

Johnston Construction Company served as the contractor for the comprehensive rehabilitation of fourteen filters at the 44th Street Water Treatment Plant.

Removed the existing steel filter-face piping, poppet valves, and interconnecting piping serving fourteen treatment filters.

Browse all project experience