Contract details
- Johnston Construction Company — Contract
- $851,890
- B & R Electrical Contractors — Contract
- $94,940
Design-Build Team Members
- Owner
- City of Aberdeen
- Design Engineer
- Stearns & Wheler
- Owner’s Consultant
- ARRO Consulting, Inc.
- Prime Contractor / Design-Builder
- Johnston Construction Company
Key Accomplishments
Johnston Construction Company
- Furnished a new degasification system designed to reduce volatile contaminants in the raw water.
- Designed the replacement equipment to address contaminants including MTBE, tetrachloroethene and benzene.
- Removed and replaced three existing gate valves feeding the degasifier system.
- Modified existing process piping to accommodate the replacement degasifiers and exhaust system.
- Modified existing ductwork where required for the new equipment configuration.
- Installed new process piping, valves and appurtenances associated with the replacement system.
- Constructed new reinforced-concrete equipment pads to support the replacement degasifiers.
- Repaired and upgraded the existing concrete floor within the Degasifier Room.
- Installed a heavy-duty, chemical-resistant floor topping system with slip-resistant aggregate.
- Sealed floor edges, wall interfaces and doorway areas with chemical-resistant sealant.
- Cleaned, prepared, primed and recoated existing piping and equipment within the Degasifier Room.
- Replaced deteriorated electrical conduit and wiring throughout the treatment plant.
B & R Electrical Contractors
- Furnished and installed a complete electrical system associated with the Aberdeen Water Treatment Plant upgrade.
- Rewired existing electrical circuits throughout portions of the operating treatment facility.
- Removed, relocated and replaced deteriorated electrical conduit and wiring serving existing plant equipment.
- Furnished and installed new electrical wiring and conduit for the replacement degasifier system.
- Provided power and control wiring for the new degasifier control panel.
- Connected the degasifier control panel to the plant’s existing emergency-power system.
- Furnished wiring and conduit for two motorized degasifier influent valves.
- Furnished wiring and conduit for two degasifier blowers.
- Furnished wiring and conduit for two degasifier drain solenoid valves.
- Installed electrical wiring and conduit for two degasifier flow meters.
- Installed wiring and conduit for two degasifier float switches.
- Installed wiring and conduit for two degasifier pressure switches.
- Furnished wiring and conduit for the motorized bypass valve serving the degasifier process.
- Provided electrical wiring for new ventilation equipment installed in the former scrubber room.
Project Description
Provided complete design-build delivery for major upgrades to the City of Aberdeen Water Treatment Plant.
Replaced two existing water-treatment degasifiers and their associated exhaust equipment.