Johnston Construction Company — Contract
$851,890
B & R Electrical Contractors — Contract
$94,940

Design-Build Team Members

Owner
City of Aberdeen
Design Engineer
Stearns & Wheler
Owner’s Consultant
ARRO Consulting, Inc.
Prime Contractor / Design-Builder
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • Furnished a new degasification system designed to reduce volatile contaminants in the raw water.
  • Designed the replacement equipment to address contaminants including MTBE, tetrachloroethene and benzene.
  • Removed and replaced three existing gate valves feeding the degasifier system.
  • Modified existing process piping to accommodate the replacement degasifiers and exhaust system.
  • Modified existing ductwork where required for the new equipment configuration.
  • Installed new process piping, valves and appurtenances associated with the replacement system.
  • Constructed new reinforced-concrete equipment pads to support the replacement degasifiers.
  • Repaired and upgraded the existing concrete floor within the Degasifier Room.
  • Installed a heavy-duty, chemical-resistant floor topping system with slip-resistant aggregate.
  • Sealed floor edges, wall interfaces and doorway areas with chemical-resistant sealant.
  • Cleaned, prepared, primed and recoated existing piping and equipment within the Degasifier Room.
  • Replaced deteriorated electrical conduit and wiring throughout the treatment plant.

B & R Electrical Contractors

  • Furnished and installed a complete electrical system associated with the Aberdeen Water Treatment Plant upgrade.
  • Rewired existing electrical circuits throughout portions of the operating treatment facility.
  • Removed, relocated and replaced deteriorated electrical conduit and wiring serving existing plant equipment.
  • Furnished and installed new electrical wiring and conduit for the replacement degasifier system.
  • Provided power and control wiring for the new degasifier control panel.
  • Connected the degasifier control panel to the plant’s existing emergency-power system.
  • Furnished wiring and conduit for two motorized degasifier influent valves.
  • Furnished wiring and conduit for two degasifier blowers.
  • Furnished wiring and conduit for two degasifier drain solenoid valves.
  • Installed electrical wiring and conduit for two degasifier flow meters.
  • Installed wiring and conduit for two degasifier float switches.
  • Installed wiring and conduit for two degasifier pressure switches.
  • Furnished wiring and conduit for the motorized bypass valve serving the degasifier process.
  • Provided electrical wiring for new ventilation equipment installed in the former scrubber room.

Project Description

Provided complete design-build delivery for major upgrades to the City of Aberdeen Water Treatment Plant.

Replaced two existing water-treatment degasifiers and their associated exhaust equipment.