Markets Served / Project Experience

Artesian Wilmington Airport Water Treatment Plant Renovation

New Castle, New Castle County, Delaware

LocationNew Castle, New Castle County, Delaware
MarketWater Treatment Plants

Contract details

Johnston Construction Company — Contract
$322,473.00
B & R Electrical Contractors — Contract
$79,515.00

Team Members

Owner
Artesian Water Company, Inc.
Engineer
Artesian Water Company, Inc., Engineering Department
Prime Contractor
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • Installed the new CUF treatment unit within the Filter Building and completed the required connections between the new treatment equipment and the existing raw-water and filtered-water systems.
  • Made a new connection to the existing raw-water line entering the Filter Building and installed new raw-water piping within the existing pipe trench.
  • Installed new grating over the existing Filter Building piping trench to provide safe access around the renovated process system.
  • Connected the new treatment process to the facility's existing filtered-water discharge line, integrating the new iron-removal equipment into the operating water-treatment system.
  • Furnished and installed process piping, valves, fittings, hangers, supports and associated appurtenances serving raw water, finished water, process, drain and instrumentation systems. The process-piping specifications required installation, testing and disinfection of the completed piping systems.
  • Installed new hypochlorite storage, venting and chemical-injection systems within the Filter Building.
  • Installed a new hypochlorite tank in the Chlorine Room, together with new chemical pumps, chemical-feed piping and a new disinfectant injection connection to the filtered-water system.
  • Provided spill containment for the chemical-storage installation and installed new double doors serving the renovated Chlorine Room.
  • Installed new fluoride storage, venting and injection systems as part of the facility's upgraded chemical-feed operations.
  • Installed new phosphate storage, venting and injection systems within the Pump Building, expanding and modernizing the facility's chemical-treatment capabilities.
  • Installed new water-quality analyzers with associated feed and drain piping and integrated analyzer signals into the plant's SCADA system.
  • Installed pressure instrumentation including a pressure transducer on the Filter Building discharge piping and an additional pressure transducer downstream of the existing service pumps.

B & R Electrical Contractors

  • Served as the electrical subcontractor to Johnston Construction Company for the Wilmington Airport Water Treatment Plant renovation, providing the electrical work associated with installation of new iron-removal treatment equipment and supporting process systems.
  • Furnished the labor, materials, tools, equipment and supervision required to execute the electrical portion of the treatment-plant renovation.
  • Completed major electrical-service modifications at the Pump Building as part of the facility's power-distribution improvements.
  • Furnished and installed a new 600-amp main non-fused disconnect serving the upgraded electrical system.
  • Furnished and installed a new 600-amp I-LINE panelboard with transient-voltage-surge-suppression provisions and associated circuit protection.
  • Installed an additional lighting/power panelboard for the renovated facility electrical loads.
  • Furnished and installed electrical disconnect switches serving the air compressor, existing electric unit heaters and other mechanical/process equipment.
  • Rearranged the existing electrical service so that the renovated distribution system could support the existing motor-control center and new electrical equipment required for the water-treatment improvements.
  • Furnished and installed new conduit and conductors throughout the project as required for new treatment equipment, instrumentation, lighting, receptacles and control systems.
  • Provided electrical connections for the new 75-horsepower treatment-unit motor, integrating the new iron-removal process equipment into the plant electrical system.
  • Connected process instrumentation including level transducers/transmitters, chemical-feed pumps, fluorine analyzer, chlorine analyzer and flow meter.
  • Furnished and installed the electrical and control wiring necessary for the process analyzers to communicate with the plant's SCADA system.
  • Provided electrical connections and control wiring for the new treatment equipment in accordance with the project's Division 16 requirements.
  • Installed new lighting, switches and receptacles in the Filter Building as part of the facility renovation.

Project Description

Served as Prime Contractor for the Facility Renovations at the Wilmington Airport Water Treatment Plant under Contract No. W-15-1, completing a comprehensive renovation of an existing potable-water treatment facility for Artesian Water Company. The executed contract identifies Artesian Water Company, Inc. as Owner and Johnston Construction Company as Contractor.

Renovated the existing water treatment plant to incorporate new iron-removal treatment equipment designed for approximately 800,000 gallons per day, together with the necessary process piping, mechanical systems, electrical systems and controls.

Browse all project experience