LocationBrady Township, Lycoming County, Pennsylvania
MarketPump Stations
Contract
$504,647
Team Members
- Owner
- Gregg Township Municipal Authority
- Engineer
- Larson Design Group
- Prime Contractor
- Johnston Construction Company
Key Accomplishments
- The company installed the new valve chamber, process piping, pipe penetrations, restraints, couplings, plug valves, ball-check valves, air-release and vacuum valves, pressure gauges, and related piping appurtenances.
- JCC constructed and installed a new chemical-storage tank and chemical-feed system supporting wastewater-treatment operations.
- The company completed excavation, trenching, structural fill, granular fill, bedding, backfill, compaction, grading, and restoration around the pump station, valve chamber, chemical tank, and site utilities.
- JCC installed sanitary-sewer piping and coordinated the connection of the new pump station to the force main constructed by others.
- The work included concrete ballast and anchorage for the packaged pump station, concrete around the wet well, structural slabs, equipment supports, and related concrete construction.
- JCC furnished and installed the davit-crane system required for lifting and maintaining the submersible pumping equipment.
- The company installed chain-link fencing, gates, erosion- and sediment-control measures, final grading, topsoil, seeding, and mulch.
- JCC coordinated construction while the existing wastewater-treatment plant remained operational and sequenced the final sewer and force-main connections around completion of the new facilities.
- The company supported manufacturer inspections, pump testing, chemical-feed-system testing, startup, operator instruction, record documentation, cleanup, and final project closeout.
- Johnston Construction Company performed Contract No. 1 – General Construction for the Brady Township Southeast Pump Station project in Allenwood, Pennsylvania.
- The project provided Gregg Township Municipal Authority with a new sewage pump station, a chemical-storage and feed system, site utilities, piping, earthwork, fencing, and supporting civil and mechanical improvements.
- Gregg Township Municipal Authority entered directly into the construction agreement with Johnston Construction Company.
Project Description
Johnston Construction Company served as the prime General Construction Contractor for the Brady Township Southeast Pump Station project.
JCC constructed a new packaged sewage pump station, including the wet well, submersible pumps, discharge piping, guide-rail assemblies, valves, access components, and associated mechanical equipment.