LocationWaldorf, Charles County, Maryland
MarketPump Stations
Contract details
- Johnston Construction Company — Contract
- $235,420
- B & R Electrical Contractors — Contract
- $29,669
Team Members
- Owner
- Charles County Government – Department of Public Works, Utilities
- Engineer
- Whitman, Requardt and Associates, LLP
- Prime Contractor
- Johnston Construction Company
Key Accomplishments
Johnston Construction Company
- Performed construction at an existing wet well/dry well sewage pumping station while coordinating continued wastewater operations.
- Completed work around an existing dry-well pumping system located approximately 23 feet below grade.
- Performed demolition necessary to accommodate the new building-access and process improvements.
- Installed a new wet well access hatch to improve access to the existing pumping facility.
- Coordinated structural and architectural modifications associated with the new access improvements.
- Designed, coordinated and implemented a temporary bypass pumping system so the existing pump station could be taken offline during critical portions of construction.
- Furnished the labor, equipment, temporary piping, power and maintenance necessary to support temporary pumping operations.
- Coordinated a bypass system designed around approximately 1,630 gpm at 81.2 feet TDH.
- Provided a minimum of two duty bypass pumps and one standby pump to maintain wastewater conveyance during construction.
- Maintained bypass-pumping capability 24 hours per day for the duration required to complete affected work.
- Used restrained temporary discharge piping and associated supports to reduce the risk of accidental wastewater releases.
- Coordinated pumping-system monitoring and maintenance to prevent high-level and overflow conditions at the station.
B & R Electrical Contractors
- Served as the Electrical Subcontractor to Johnston Construction Company for the Pump Station 5A Building Access Modifications project.
- Furnished the labor, materials, tools and supervision required to perform BRE's electrical scope.
- Performed electrical demolition associated with the pump-station modifications.
- Furnished and installed electrical conduit, wire and equipment connections.
- Installed galvanized rigid conduit (GRC) for exposed electrical work.
- Installed PVC conduit for underground electrical ductbanks.
- Performed excavation associated with BRE's underground electrical ductbank work.
- Installed underground raceways supporting the modified pump-station electrical systems.
- Installed electrical boxes and devices required for the project.
- Installed wiring and conductors serving modified and new equipment.
- Performed instrumentation-related electrical work included within BRE's subcontract.
- Installed project lighting furnished by Johnston Construction Company.
- Installed project switchgear furnished by Johnston Construction Company.
- Coordinated electrical materials supplied by others.
Project Description
Served as Prime Contractor for the comprehensive building-access and process-support improvements at Charles County's existing Pump Station 5A.
Coordinated civil, architectural, mechanical, chemical-feed, electrical and controls work required to complete the modifications.