LocationUpper Marlboro, Prince George's County, Maryland
MarketWater Storage and Tanks
Contract
$76,747
Team Members
- Owner
- Washington Suburban Sanitary Commission (WSSC)
- Engineer
- Whitman, Requardt & Associates, LLP
- Prime Contractor
- Landmark Structures I, L.P.
- Civil Subcontractor
- Johnston Construction Company
Key Accomplishments
- Installed 6-inch gate valves and associated blow-off and hydrant appurtenances at designated locations along the project waterline.
- Furnished and installed required materials and performed pressure testing of approximately 1,155 linear feet of 24-inch water main from STA 0+00 to STA 11+55.
- Performed water-main testing in accordance with WSSC requirements, including hydrostatic pressure testing, leakage testing, advance coordination with the Engineer and use of required test instrumentation.
- Worked under WSSC testing criteria requiring the hydrostatic pressure test to be maintained for a minimum of two hours, followed by leakage testing in accordance with the applicable project requirements.
- Coordinated water-main testing with the project's applicable chlorination requirements, including provisions for chlorination to occur in conjunction with hydrostatic testing unless otherwise approved by the Engineer.
- Performed required backfill, compaction and compaction testing associated with JCC's valve and pipeline work in accordance with the project's pipeline-earthwork requirements.
- Coordinated with Corrosion Specialties to ensure underground water-main cathodic protection was installed and remained intact during JCC's work.
- Maintained responsibility for ensuring areas installed or disturbed under JCC's subcontract were leak-free and compliant with the applicable testing requirements.
- Provided full-time on-site supervision and coordinated required inspections, testing and witnessing with Landmark Structures and WSSC.
- Coordinated activities with other contractors to maintain site access and the overall construction schedule.
- Maintained required as-built records, submittals and O&M documentation for materials and systems installed under JCC's scope.
- Located and protected existing above- and below-ground utilities and structures and provided required trench-safety measures for JCC's pipeline activities.
Project Description
Served as Civil Subcontractor to Landmark Structures I, L.P. for waterline testing and valve installation associated with the Collington Elevated Water Storage Facility.
Installed the project air release valve assembly, including Polyken wrap, solid sleeve, manhole, associated accessories, backfill, compaction and compaction testing.