LocationHaymarket, Prince William County, Virginia
MarketPump Stations
Contract details
- Johnston Construction Company — Contract
- $931,630
- B & R Electrical Contractors — Contract
- $149,960
Team Members
- Owner / Developer
- Prince William Land I, LLC / Toll Brothers, Inc.
- Engineer
- Waste Water Management, Inc.
- Prime Contractor
- Johnston Construction Company
Key Accomplishments
Johnston Construction Company
- Constructed the new sewage pump station infrastructure and coordinated all required utility connections.
- Constructed the project's monolithic cast-in-place concrete wet well.
- Constructed the monolithic cast-in-place comminutor chamber.
- Constructed the new valve vault serving the pump-station discharge system.
- Installed two submersible sewage pumps and associated pumping-system equipment.
- Furnished and coordinated the pump control system, including provisions for simultaneous operation of both pumps during high-demand conditions.
- Integrated pump operating status, HOA position, high-temperature alarms, seal-failure alarms and pump-fault alarms with the station's SCADA system.
- Installed the new channel-mounted comminutor and associated local controls.
- Incorporated high-level monitoring of the comminutor influent channel through the PLC/control system.
- Installed process piping, valves, fittings, supports and associated appurtenances required for a fully functioning wastewater pumping facility.
- Installed new sanitary sewer and force-main connections associated with the pump station.
- Performed utility trenching, pipe bedding, backfilling and compaction.
B & R Electrical Contractors
- Served as the electrical subcontractor to Johnston Construction Company for construction of the new Dominion Valley Section 53 Sanitary Sewage Pump Station.
- Furnished electrical labor, materials, tools, equipment and supervision necessary to execute BRE's contracted electrical work.
- Performed electrical construction in accordance with the project's Division 16 electrical specifications and Electrical Drawings E-1 through E-6.
- Furnished and installed conduit, wiring and connections for lighting and power systems throughout the new pump-station facility.
- Furnished conduit, wiring and electrical connections serving instrumentation and control panels furnished by others.
- Furnished conduit, wiring and electrical connections serving the station's intrusion/security system furnished by others.
- Furnished and installed the project's lighting systems and fixtures.
- Installed electrical infrastructure serving the new pump-station control building and process structures.
- Furnished and installed major electrical gear within BRE's scope.
- Furnished and installed the station's Power Quality Monitor (PQM).
- Furnished and installed panelboard-related electrical infrastructure.
- Installed grounding and bonding systems associated with BRE's electrical work.
- Furnished and installed applicable dry-type transformer equipment.
- Installed disconnect switches and circuit breakers serving pump-station equipment.
Project Description
Served as Prime Contractor for construction of a complete new sanitary sewage pumping station serving Dominion Valley Section 53.
Delivered a complete duplex submersible sewage pump station incorporating civil, structural, mechanical, electrical, instrumentation and site improvements.