Dominion Valley Section 53 Sanitary Sewage Pump Station

Haymarket, Prince William County, Virginia

LocationHaymarket, Prince William County, Virginia
MarketPump Stations

Contract details

Johnston Construction Company — Contract
$931,630
B & R Electrical Contractors — Contract
$149,960

Team Members

Owner / Developer
Prince William Land I, LLC / Toll Brothers, Inc.
Engineer
Waste Water Management, Inc.
Prime Contractor
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • Constructed the new sewage pump station infrastructure and coordinated all required utility connections.
  • Constructed the project's monolithic cast-in-place concrete wet well.
  • Constructed the monolithic cast-in-place comminutor chamber.
  • Constructed the new valve vault serving the pump-station discharge system.
  • Installed two submersible sewage pumps and associated pumping-system equipment.
  • Furnished and coordinated the pump control system, including provisions for simultaneous operation of both pumps during high-demand conditions.
  • Integrated pump operating status, HOA position, high-temperature alarms, seal-failure alarms and pump-fault alarms with the station's SCADA system.
  • Installed the new channel-mounted comminutor and associated local controls.
  • Incorporated high-level monitoring of the comminutor influent channel through the PLC/control system.
  • Installed process piping, valves, fittings, supports and associated appurtenances required for a fully functioning wastewater pumping facility.
  • Installed new sanitary sewer and force-main connections associated with the pump station.
  • Performed utility trenching, pipe bedding, backfilling and compaction.

B & R Electrical Contractors

  • Served as the electrical subcontractor to Johnston Construction Company for construction of the new Dominion Valley Section 53 Sanitary Sewage Pump Station.
  • Furnished electrical labor, materials, tools, equipment and supervision necessary to execute BRE's contracted electrical work.
  • Performed electrical construction in accordance with the project's Division 16 electrical specifications and Electrical Drawings E-1 through E-6.
  • Furnished and installed conduit, wiring and connections for lighting and power systems throughout the new pump-station facility.
  • Furnished conduit, wiring and electrical connections serving instrumentation and control panels furnished by others.
  • Furnished conduit, wiring and electrical connections serving the station's intrusion/security system furnished by others.
  • Furnished and installed the project's lighting systems and fixtures.
  • Installed electrical infrastructure serving the new pump-station control building and process structures.
  • Furnished and installed major electrical gear within BRE's scope.
  • Furnished and installed the station's Power Quality Monitor (PQM).
  • Furnished and installed panelboard-related electrical infrastructure.
  • Installed grounding and bonding systems associated with BRE's electrical work.
  • Furnished and installed applicable dry-type transformer equipment.
  • Installed disconnect switches and circuit breakers serving pump-station equipment.

Project Description

Served as Prime Contractor for construction of a complete new sanitary sewage pumping station serving Dominion Valley Section 53.

Delivered a complete duplex submersible sewage pump station incorporating civil, structural, mechanical, electrical, instrumentation and site improvements.