LocationDover, Kent County, Delaware
MarketWater Treatment Plants
Contract details
- Johnston Construction Company — Contract
- $6,592,038
- Concrete Services Division — Contract
- $216,364
- B & R Electrical Contractors — Contract
- $795,190
Team Members
- Owner
- City of Dover
- Engineer
- AECOM
- Prime Contractor
- Johnston Construction Company
Key Accomplishments
Johnston Construction Company
- Renovated the existing water-treatment facility while integrating new treatment processes and infrastructure.
- Expanded and improved the plant to increase treated-water capacity and enhance the existing treatment process.
- Constructed new treatment facilities supporting the plant's expanded process operations.
- Constructed new process tanks associated with backwash and residuals handling.
- Constructed improvements associated with the new filter building and support tanks.
- Constructed new backwash processing and residuals facilities.
- Constructed new GCL-lined sand drying beds for treatment-process residuals handling.
- Performed subgrade preparation, liner installation and aggregate placement associated with the sand drying beds.
- Installed sand, rice gravel and pea-gravel media layers associated with the drying-bed system.
- Coordinated process piping through the sand drying beds and related facilities.
- Furnished and coordinated a complete automatic pressure-filtration system.
- Included treatment vessels, inlet distributors/waste collectors, underdrain distributors, support gravel and filtration media as components of the pressure-filtration system.
Concrete Services Division
- Performed specialized cast-in-place concrete construction supporting a major municipal water treatment plant improvement project.
- Furnished labor, supervision, formwork-related materials, tools and equipment necessary to execute CSD's concrete scope.
- Performed concrete work for the Filter Building.
- Performed concrete work for the Backwash/Residuals Building.
- Performed concrete work associated with the Sand Drying Beds.
- Performed concrete improvements associated with renovations to the existing Treatment Building.
- Mobilized and demobilized concrete equipment, tools and supplies required for the work.
- Furnished, installed and stripped concrete formwork.
- Formed footings, slabs-on-grade, straight walls, columns and special concrete elements.
- Placed concrete for footings, slabs-on-grade, walls, columns and miscellaneous fill applications.
- Performed concrete finishing, including floating, screeding and machine troweling.
- Performed point-and-patch finishing to completed concrete surfaces.
- Performed concrete curing and furnished associated curing supplies.
- Installed concrete accessories associated with premolded joint material and waterstops.
B & R Electrical Contractors
- Performed the major electrical construction package for the City of Dover's comprehensive Water Treatment Plant Process Improvements project.
- Furnished electrical labor, materials, tools, equipment and supervision required to complete BRE's subcontracted work.
- Installed power conduit, instrumentation conduit, wiring and electrical connections throughout the upgraded treatment facility.
- Installed electrical infrastructure serving new and renovated water-treatment process equipment.
- Furnished and installed conduit systems appropriate for interior, exterior, underground and process-area conditions.
- Installed underground electrical raceways and associated electrical infrastructure.
- Performed electrical duct-bank excavation associated with the project electrical drawings.
- Installed wiring and connections for new plant electrical-distribution systems.
- Performed modifications and demolition involving portions of the plant's existing motor-control-center infrastructure.
- Furnished and installed work associated with MCC-A, MCC-B and MCC-C.
- Coordinated startup and training associated with the three motor-control centers.
- Installed and coordinated electrical distribution equipment serving upgraded process loads.
- Installed electrical panelboard-related infrastructure serving new and renovated treatment areas.
- Coordinated new electrical equipment with existing plant distribution systems.
Project Description
Served as Prime Contractor for a comprehensive process upgrade to the City of Dover's Long Point Water Treatment Plant.
Managed a multi-discipline construction program incorporating civil, structural, architectural, mechanical, process, electrical, instrumentation and controls improvements.