LocationSpringettsbury Township, York County, Pennsylvania
MarketWastewater Treatment Plants
Contract
$21,659
Team Members
- Owner
- Springettsbury Township
- Engineer
- Buchart Horn, Inc.
- Prime Contractor
- Anrich, Inc.
- Trade Subcontractor
- B & R Electrical Contractors, Inc. (BRE)
Key Accomplishments
- Performed trenching and backfill associated with underground electrical ductbanks.
- Provided concrete and excavation required for electrical equipment racks and meter-base installation.
- Furnished and installed the specified switchgear disconnect and Milbank pedestal meter base.
- Coordinated installation of a new wood utility pole serving the project.
- Provided electrical support for the interceptor flow-meter installation and associated instrumentation.
- Supported flow-meter startup as required.
- Coordinated BRE’s electrical scope with Anrich, Inc., the project engineer and other trades involved in the interceptor improvements.
- B & R Electrical Contractors, Inc. served as a Trade Subcontractor to Anrich, Inc. for the East York Interceptor Upgrade in Springettsbury Township, Pennsylvania. The executed subcontract identifies Anrich, Inc. as the Contractor and B & R Electrical Contractors, Inc. as the Subcontractor for the project.
- BRE’s scope included furnishing and installing power conduit, wire and electrical connections required for the interceptor improvements. The work also included instrumentation conduit, wiring, junction boxes and related connections supporting the project’s monitoring and flow-measurement systems.
- Underground electrical construction included trenching and backfill for ductbanks, together with concrete and excavation required for equipment racks and the meter-base installation. BRE also furnished and installed the specified switchgear disconnect and Milbank pedestal meter base and provided a new wood utility pole as part of the project electrical infrastructure.
- The project drawings show the electrical and instrumentation equipment support arrangement associated with the interceptor upgrade, including conduit routing and equipment-mounting provisions. BRE coordinated its installation with the civil and interceptor work being performed under the overall project.
- BRE’s quotation also included assistance with startup of the flow meter if required, supporting commissioning of the new interceptor monitoring equipment.
Project Description
Furnished and installed electrical power conduit, wiring and equipment connections for the East York Interceptor Upgrade.
Installed instrumentation conduit, wiring, junction boxes and associated electrical connections.