Ebenezer Church Sewage Pump Station Replacement

Stafford, Stafford County, Virginia

LocationStafford, Stafford County, Virginia
MarketPump Stations

Contract details

Johnston Construction Company — Contract
$1,068,164
B & R Electrical Contractors — Contract
$93,640

Team Members

Owner
Stafford County, Virginia – Department of Utilities
Engineer
Hazen and Sawyer
Prime Contractor
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • Demolished the existing pump-station wet well and pumps after establishing approved temporary wastewater pumping operations.
  • Constructed and installed a new wet well and packaged sewage pump station.
  • Installed a new pre-fabricated horizontal self-priming centrifugal pump station and associated mechanical systems.
  • Constructed a new pig launching vault as part of the station's force-main system.
  • Installed new gravity-sewer piping, manholes and associated underground utility infrastructure.
  • Installed and tested new yard piping between Manholes SAN1 and SAN2, the new wet well and associated cleanout connections.
  • Installed a new 4-inch HDPE force main serving the replacement pump station.
  • Coordinated and completed connections between the new force main and existing wastewater infrastructure.
  • Installed the new force main through the existing force-main crossing along Onville Road and completed associated tie-in work.
  • Coordinated the final connection of the new pump station to the existing collection system only after successful testing and demonstration of the new facilities.
  • Maintained continuous wastewater pumping service while the existing pump station was being replaced.
  • Designed, furnished, installed, operated, maintained and removed a complete temporary pump-around system for uninterrupted wastewater conveyance.

B & R Electrical Contractors

  • Served as the electrical subcontractor to Johnston Construction Company for construction of Stafford County's new Ebenezer Church Sewage Pump Station.
  • Furnished the electrical labor, materials, tools and supervision required for BRE's contracted portion of the new wastewater pumping facility.
  • Performed electrical work in accordance with Division 16 – Electrical of the project specifications and Electrical Drawings E-1 through E-4.
  • Mobilized electrical personnel, tools, equipment and materials necessary to support the project construction schedule.
  • Furnished and installed conduit, conductors and electrical connections for power systems throughout the new sewage pump station.
  • Furnished and installed conduit, wire and connections for the station lighting systems.
  • Installed project lighting and associated electrical connections.
  • Furnished and installed panels and electrical gear required within BRE's subcontract scope.
  • Installed raceway and wiring infrastructure supporting the station's process and building electrical systems.
  • Furnished conduit, wiring and electrical connections associated with the project's instrumentation systems.
  • Coordinated electrical raceways and conductors serving instrumentation and process-control equipment furnished under other portions of the project.
  • Completed electrical connections supporting the station's control and monitoring systems while the instrumentation equipment itself remained outside BRE's supply scope.
  • Provided electrical infrastructure supporting operation of the new packaged sewage pump station and its associated mechanical equipment.
  • Coordinated power and control connections associated with the replacement wastewater pumping equipment.

Project Description

Served as Prime Contractor for construction of a new sewage pumping station for Stafford County.

Constructed a complete wastewater pump station designed for an ultimate build-out safe capacity of 140 gallons per minute (GPM).