LocationStafford, Stafford County, Virginia
MarketPump Stations
Contract details
- Johnston Construction Company — Contract
- $1,068,164
- B & R Electrical Contractors — Contract
- $93,640
Team Members
- Owner
- Stafford County, Virginia – Department of Utilities
- Engineer
- Hazen and Sawyer
- Prime Contractor
- Johnston Construction Company
Key Accomplishments
Johnston Construction Company
- Demolished the existing pump-station wet well and pumps after establishing approved temporary wastewater pumping operations.
- Constructed and installed a new wet well and packaged sewage pump station.
- Installed a new pre-fabricated horizontal self-priming centrifugal pump station and associated mechanical systems.
- Constructed a new pig launching vault as part of the station's force-main system.
- Installed new gravity-sewer piping, manholes and associated underground utility infrastructure.
- Installed and tested new yard piping between Manholes SAN1 and SAN2, the new wet well and associated cleanout connections.
- Installed a new 4-inch HDPE force main serving the replacement pump station.
- Coordinated and completed connections between the new force main and existing wastewater infrastructure.
- Installed the new force main through the existing force-main crossing along Onville Road and completed associated tie-in work.
- Coordinated the final connection of the new pump station to the existing collection system only after successful testing and demonstration of the new facilities.
- Maintained continuous wastewater pumping service while the existing pump station was being replaced.
- Designed, furnished, installed, operated, maintained and removed a complete temporary pump-around system for uninterrupted wastewater conveyance.
B & R Electrical Contractors
- Served as the electrical subcontractor to Johnston Construction Company for construction of Stafford County's new Ebenezer Church Sewage Pump Station.
- Furnished the electrical labor, materials, tools and supervision required for BRE's contracted portion of the new wastewater pumping facility.
- Performed electrical work in accordance with Division 16 – Electrical of the project specifications and Electrical Drawings E-1 through E-4.
- Mobilized electrical personnel, tools, equipment and materials necessary to support the project construction schedule.
- Furnished and installed conduit, conductors and electrical connections for power systems throughout the new sewage pump station.
- Furnished and installed conduit, wire and connections for the station lighting systems.
- Installed project lighting and associated electrical connections.
- Furnished and installed panels and electrical gear required within BRE's subcontract scope.
- Installed raceway and wiring infrastructure supporting the station's process and building electrical systems.
- Furnished conduit, wiring and electrical connections associated with the project's instrumentation systems.
- Coordinated electrical raceways and conductors serving instrumentation and process-control equipment furnished under other portions of the project.
- Completed electrical connections supporting the station's control and monitoring systems while the instrumentation equipment itself remained outside BRE's supply scope.
- Provided electrical infrastructure supporting operation of the new packaged sewage pump station and its associated mechanical equipment.
- Coordinated power and control connections associated with the replacement wastewater pumping equipment.
Project Description
Served as Prime Contractor for construction of a new sewage pumping station for Stafford County.
Constructed a complete wastewater pump station designed for an ultimate build-out safe capacity of 140 gallons per minute (GPM).