LocationFort Meade, Maryland
MarketWastewater Treatment Plants
Contract
$89,323
Team Members
- Owner
- U.S. Government
- Engineer
- American Water Enterprises, LLC
- Prime Contractor
- American Water Operations and Maintenance, LLC
- Civil Subcontractor
- Johnston Construction Company
Key Accomplishments
- JCC removed and disposed of the existing valves and installed the replacement valves furnished by American Water.
- JCC furnished the fittings, spool pieces, connection components, labor, equipment, and rigging required to complete the valve installations.
- The valve replacements were coordinated around scheduled process outages to maintain safe operation of the active wastewater-treatment facility.
- JCC developed and maintained the required construction sequencing, project-execution, quality-control, and site-specific safety plans.
- The completed valve installations were inspected, tested, placed into service, and coordinated with American Water’s operating personnel.
- JCC provided startup support, operational training, technical documentation, cleanup, and restoration of the affected work areas.
- Johnston Construction Company performed the WWTP Backwash Valves Replacement project at the Fort George G. Meade Wastewater Treatment Plant in Maryland.
- The project was completed at a U.S. Government military installation operated and maintained through American Water’s military-services organization. American Water Operations and Maintenance, LLC contracted with Johnston Construction Company to perform the valve-replacement work, while American Water Enterprises, LLC provided the engineering and project-design support.
- The purpose of the project was to improve the reliability and operating condition of the backwash-water pumping system by replacing the existing large-diameter isolation and check valves serving Backwash Pumps 1 and 2.
- The work included one 18-inch gate valve and one 18-inch check valve at each pump, for a total of four major valve replacements.
- JCC furnished the labor, tools, supervision, equipment, rigging, and supporting materials required to complete the installations.
- American Water provided the two replacement 18-inch gate valves and two replacement 18-inch check valves.
Project Description
Johnston Construction Company replaced the large-diameter gate and check valves serving Backwash Pumps 1 and 2 at the Fort George G. Meade Wastewater Treatment Plant.
The project included replacement of two 18-inch gate valves and two 18-inch check valves within the operating backwash-water pumping system.