Fort George G. Meade WWTP – Fine Screen Parts Replacement

Fort Meade / Laurel, Maryland

LocationFort Meade / Laurel, Maryland
MarketWastewater Treatment Plants

Contract

$191,921

Team Members

Owner
American Water Operations and Maintenance, LLC
Engineer
American Water Operations and Maintenance, LLC
Prime Contractor
American Water Operations and Maintenance, LLC, American Water Enterprises, LLC, and American Water Military Services, LLC
Civil Subcontractor
Johnston Construction Company

Key Accomplishments

  • The company removed and replaced two existing screen troughs with new stainless-steel trough assemblies featuring six-millimeter perforations.
  • JCC replaced the existing fine-screen side plates with new stainless-steel side plates.
  • The work included new stainless-steel wash-water piping and spray nozzles serving both fine-screen systems.
  • JCC completed the required mechanical and electrical disconnections, equipment removal, installation, reconnection, and startup work.
  • Heat tracing and insulation were installed on the new wash-water piping to protect the system during cold-weather operation.
  • Construction was carefully sequenced so one fine screen remained operational while work proceeded on the other unit.
  • JCC conducted performance testing and commissioning to verify the proper operation of the rehabilitated fine-screen systems.
  • Johnston Construction Company performed the WWTP Fine Screen Parts Replacement project at the Fort George G. Meade Wastewater Treatment Plant in Laurel, Maryland.
  • The project upgraded two existing mechanical fine screens that remove solids and debris from wastewater before the flow enters downstream treatment processes.
  • American Water Operations and Maintenance, LLC administered the project at the Fort Meade military installation and retained Johnston Construction Company as its subcontractor under Task Order No. 2.
  • Before construction began, JCC coordinated site access, safety requirements, project scheduling, equipment submittals, outage planning, quality-control procedures, and construction sequencing with American Water personnel.
  • Because the work occurred at an active wastewater-treatment facility on a military installation, JCC was required to comply with facility security, safety, environmental, and operational requirements.

Project Description

Johnston Construction Company rehabilitated two fine-screen systems serving the Fort George G. Meade Wastewater Treatment Plant.

JCC removed the existing rotor-screw augers and installed two new augers complete with spiral nylon brushes.