LocationFort Meade / Laurel, Maryland
MarketWastewater Treatment Plants
Contract
$191,921
Team Members
- Owner
- American Water Operations and Maintenance, LLC
- Engineer
- American Water Operations and Maintenance, LLC
- Prime Contractor
- American Water Operations and Maintenance, LLC, American Water Enterprises, LLC, and American Water Military Services, LLC
- Civil Subcontractor
- Johnston Construction Company
Key Accomplishments
- The company removed and replaced two existing screen troughs with new stainless-steel trough assemblies featuring six-millimeter perforations.
- JCC replaced the existing fine-screen side plates with new stainless-steel side plates.
- The work included new stainless-steel wash-water piping and spray nozzles serving both fine-screen systems.
- JCC completed the required mechanical and electrical disconnections, equipment removal, installation, reconnection, and startup work.
- Heat tracing and insulation were installed on the new wash-water piping to protect the system during cold-weather operation.
- Construction was carefully sequenced so one fine screen remained operational while work proceeded on the other unit.
- JCC conducted performance testing and commissioning to verify the proper operation of the rehabilitated fine-screen systems.
- Johnston Construction Company performed the WWTP Fine Screen Parts Replacement project at the Fort George G. Meade Wastewater Treatment Plant in Laurel, Maryland.
- The project upgraded two existing mechanical fine screens that remove solids and debris from wastewater before the flow enters downstream treatment processes.
- American Water Operations and Maintenance, LLC administered the project at the Fort Meade military installation and retained Johnston Construction Company as its subcontractor under Task Order No. 2.
- Before construction began, JCC coordinated site access, safety requirements, project scheduling, equipment submittals, outage planning, quality-control procedures, and construction sequencing with American Water personnel.
- Because the work occurred at an active wastewater-treatment facility on a military installation, JCC was required to comply with facility security, safety, environmental, and operational requirements.
Project Description
Johnston Construction Company rehabilitated two fine-screen systems serving the Fort George G. Meade Wastewater Treatment Plant.
JCC removed the existing rotor-screw augers and installed two new augers complete with spiral nylon brushes.