Gifford Pinchot State Park Sewage Treatment Plant Rehabilitation

Warrington Township, York County, Pennsylvania

LocationWarrington Township, York County, Pennsylvania
MarketWastewater Treatment Plants

Contract details

Johnston Construction Company — Contract
$989,023
Concrete Services Division — Contract
$39,274

Team Members

Owner
Commonwealth of Pennsylvania, Department of Conservation and Natural Resources
Engineer
Pennsylvania DCNR Bureau of Facility Design and Construction
Prime Contractor
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • The company provided temporary sewage screening, bypass pumping, process-water pumping, monitoring, maintenance, and supporting temporary systems required to keep wastewater flowing during construction.
  • JCC removed the existing main-lift comminutor, level controls, wet-well slabs, grit, solids, debris, and associated equipment required for the new installation.
  • The company constructed a new influent box and installed a new vertical cylindrical fine-screen system for screening, washing, dewatering, and transporting solids from the incoming wastewater.
  • JCC installed fiberglass-reinforced-plastic grating, structural supports, handrails, a double-leaf chain-link access gate, and a reinforced-concrete convenience pad at the main lift station.
  • The company installed a new bypass-pumping connection and modified the main-lift roof to accommodate the new equipment and operating-access arrangement.
  • JCC removed and replaced the existing air-distribution piping, diffuser assemblies, valves, supports, and related components serving the treatment plant’s aeration tanks.
  • The company removed grit and accumulated material from the treatment tanks and repaired leaking concrete joints, cracks, penetrations, and deteriorated surfaces.
  • JCC installed a new aeration system and tested the air piping, valves, diffusers, and distribution arrangement for proper operation.
  • The company installed Owner-furnished replacement components for the settling-tank collector-drive systems.
  • JCC replaced the existing eight-inch settling-tank drain valves and operating stems.
  • The company removed and replaced deteriorated fiberglass roofing, supporting purlins, and handrails at the settling tanks.
  • JCC enlarged and modified the existing reinforced-concrete chlorine contact tank.

Concrete Services Division

  • Concrete Services Division performed concrete forming, placement, finishing, curing, and related concrete work for the rehabilitation of the Gifford Pinchot State Park sewage-treatment facilities.
  • CSD furnished the labor, form materials, form lumber, tools, finishing equipment, curing supplies, and supervision required for its assigned concrete scope.
  • The company installed and stripped approximately 883 square feet of concrete formwork associated with slabs, walls, and other treatment-plant improvements.
  • CSD completed approximately 163 square feet of slab-on-grade formwork and approximately 720 square feet of straight-wall formwork.
  • The company placed approximately 10.16 cubic yards of slab-on-grade concrete and approximately 12.54 cubic yards of wall concrete.
  • CSD placed approximately 3.33 cubic yards of concrete fill as required for the rehabilitation work.
  • The company performed floating and screeding over approximately 345 square feet of concrete surface.
  • CSD completed point-and-patch repairs over approximately 720 square feet of exposed concrete.
  • The company performed curing work covering approximately 1,228 square feet of newly placed concrete.
  • CSD installed concrete accessories associated with joints, waterstops, caulking, and related concrete details.
  • The company installed approximately 250 square feet of reinforcing mesh within its assigned work.
  • CSD installed and coordinated approximately 135 dowels for connections between new and existing concrete construction.
  • The company applied bonding compound at approximately 61 designated locations to support proper adhesion between concrete placements and existing surfaces.
  • CSD coordinated concrete deliveries purchased by JCC, concrete-pumping services paid for by JCC, and field-testing activities performed by the project testing laboratory.

Project Description

Johnston Construction Company served as the prime General Contractor for the rehabilitation of the sewage-treatment plant and main lift station at Gifford Pinchot State Park.

JCC coordinated the overall construction schedule and its work with the separate Electrical Contractor while maintaining operation of the existing wastewater-treatment facilities.