Gleneagles 2 MG Composite Elevated Water Storage Tank & Utility Facilities

White Plains, Charles County, Maryland

LocationWhite Plains, Charles County, Maryland
MarketWater Storage and Tanks

Contract details

Johnston Construction Company — Contract
$15,947,475
Concrete Services Division — Contract
$289,281
Electrical Services Division — Contract
$1,923,143

Team Members

Owner
County Commissioners of Charles County, Maryland
Prime Contractor
Johnston Construction Company
Engineer
Ashton Rogers, P.E.

Key Accomplishments

Johnston Construction Company

  • Constructed the reinforced-concrete support structure, tank foundation, steel water-storage bowl, access systems, piping, coatings, and operating appurtenances required for the complete elevated storage facility.
  • Constructed a separate line maintenance building to support Charles County water-utility field operations, equipment storage, materials, and maintenance activities.
  • Installed site water and sewer connections, process piping, valves, supports, tank overflow and drainage systems, plumbing, and associated utility infrastructure.
  • Furnished and installed the electrical service, distribution equipment, standby generator, automatic transfer switch, grounding, lighting, surge protection, and equipment connections.
  • Coordinated a complete instrumentation and control system with programmable controllers, control panels, tank-level monitoring, alarms, communications, software, and SCADA integration.
  • Installed a hydrodynamic tank-mixing system to promote water circulation and improve water quality within the elevated tank.
  • Installed cathodic-protection equipment to support the long-term protection of submerged metallic tank components.
  • Coordinated power-system studies, electrical testing, HVAC testing and balancing, process startup, commissioning, operator training, record drawings, and project closeout.
  • Johnston Construction Company served as the prime contractor for the Gleneagles Water Tower Construction project in White Plains, Maryland.
  • The principal project feature was a new two-million-gallon composite elevated water storage tank.
  • The tank consists of a reinforced-concrete support structure and a steel water-storage bowl, together with the foundation, access systems, ladders, platforms, hatches, vents, overflow piping, process piping, coatings, safety equipment, and other appurtenances required for operation and maintenance.
  • JCC coordinated the design and permitting required for the tank, offices, maintenance building, utilities, mechanical systems, electrical systems, instrumentation, controls, and site development.

Concrete Services Division

  • Concrete Services Division, LLC performed the concrete forming, placement, finishing, and curing work associated with the Gleneagles Water Tower Construction project.
  • Performed concrete work for the foundation and structural components of the new two-million-gallon composite elevated water storage tank.
  • Formed and placed the main tank foundation, tank slab, tank derrick slab, and two elevated concrete floors within the tank shaft.
  • Constructed concrete foundations and structural elements for the line maintenance building, including footings, frost walls, column footings, columns, slabs, and pipe-support pads.
  • Coordinated the placement of approximately 454 cubic yards of concrete throughout the tank, pump-station, and maintenance-building structures.
  • Installed approximately 741 square feet of footing formwork.
  • Installed approximately 159 square feet of slab-on-grade formwork.
  • Installed approximately 1,426 square feet of curved-wall formwork for the composite tank foundation and support structure.
  • Installed approximately 1,140 square feet of straight-wall formwork.
  • Installed approximately 338 square feet of column formwork.
  • Placed approximately 38 cubic yards of concrete for footings.
  • Placed approximately 152 cubic yards of slab-on-grade concrete.
  • Placed approximately 260 cubic yards of wall concrete.
  • Placed approximately 5 cubic yards of column concrete.

Electrical Services Division

  • Electrical Services Division performed the electrical construction associated with the Gleneagles Water Tower Construction project.
  • Furnished and installed the electrical service, distribution equipment, panelboards, surge-protection equipment, conduit, conductors, boxes, devices, and equipment connections required for the new water-tower facility.
  • Installed electrical systems serving the two-million-gallon composite elevated water storage tank, office and storage areas, pump station, line maintenance building, site improvements, and associated equipment.
  • Installed interior, exterior, site, and tank lighting together with switches, receptacles, controls, branch circuits, and associated wiring.
  • Installed extensive underground electrical ductbanks, including excavation, reinforcing steel, concrete encasement, conduit installation, backfilling, and coordination with other underground utilities.
  • Installed a grounding ring connected to the base of the composite water tower and coordinated grounding with the tank structure, electrical service, equipment, and lightning-protection system.
  • Furnished and installed the electrical portions of the lightning-protection system while coordinating tank-mounted downleads furnished by the tank manufacturer.
  • Installed eighteen 6-inch conduits through the tank-foundation area for future antenna and communications use.
  • Furnished and installed fire-alarm equipment and associated raceways, conductors, devices, and system connections included within ESD’s electrical scope.
  • Installed conduit and wiring serving instrumentation, RTU, HVAC, and other equipment furnished and physically installed by others.
  • Coordinated electrical connections for the standby generator and automatic transfer switch furnished by others.
  • Coordinated electrical systems with the tank structure, ladders, handrails, architectural areas, mechanical systems, plumbing, process piping, instrumentation, controls, and site-development work.
  • Electrical Services Division performed the electrical construction associated with the Gleneagles Water Tower project in White Plains, Maryland.
  • The overall project includes a new two-million-gallon composite elevated water storage tank, office and storage areas within the tank support structure, a separate line maintenance building, pump-station improvements, site utilities, standby power, instrumentation, controls, paving, drainage, and complete site development.

Project Description

Johnston Construction Company served as the prime contractor for the Gleneagles Water Tower Construction project for Charles County Government.

The project included design, permitting, and construction of a new two-million-gallon composite elevated water storage tank on a previously undeveloped site.