LocationLexington Park, St. Mary's County, Maryland
MarketWater Storage and Tanks
Contract details
- Johnston Construction Company — Contract
- $1,194,791
- Electrical Services Division — Contract
- $66,149
Team Members
- Owner
- St. Mary’s County Metropolitan Commission
- Engineer
- St. Mary’s County Metropolitan Commission
- Prime Contractor
- Johnston Construction Company
Key Accomplishments
Johnston Construction Company
- JCC installed a new 500-GPM booster pumping station, including pumps, process piping, valves, supports, vibration-isolation components, and related equipment.
- The work included new yard piping, water-main connections, valves, fittings, appurtenances, and fire-hydrant improvements.
- JCC completed reinforced-concrete foundations, slabs, equipment supports, reinforcing-steel installation, miscellaneous metals, insulation, and damp-proofing.
- The project included electrical power conductors, raceways, boxes, supports, enclosed switches, circuit breakers, equipment connections, and associated electrical upgrades.
- JCC coordinated the SCADA monitoring and control-panel improvements required to operate and monitor the new tank and booster pumping systems.
- Site improvements included clearing, earthwork, aggregate backfill, dewatering, stormwater management, sediment and erosion controls, fencing, turf establishment, and final restoration.
- JCC coordinated system startup, commissioning, operational testing, owner training, record documentation, and final turnover.
- Johnston Construction Company completed the Greenbrier Water Storage Tank project at 47314 Green Leaf Road in Lexington Park, Maryland. The project was performed for the St. Mary’s County Metropolitan Commission.
- The project included construction of a new 218,000-gallon water-storage tank, yard piping, stormwater-management improvements, sediment and erosion controls, a new 500-GPM booster pumping station, piping and valves within the water station, and electrical and SCADA upgrades.
- JCC coordinated the complete construction effort, including mobilization, scheduling, submittals, procurement, site safety, quality control, excavation, concrete construction, tank installation, pumping equipment, piping, electrical systems, instrumentation, startup, training, and closeout.
- The principal project feature was the new 218,000-gallon water-storage tank.
- JCC coordinated the tank foundation, structural components, piping penetrations, tank assembly, access systems, equipment connections, coatings, testing, and commissioning required for a complete potable-water storage facility.
Electrical Services Division
- Electrical Services Division, LLC completed the designated electrical work associated with the Greenbrier Water Storage Tank project in Lexington Park, Maryland.
- ESD furnished the labor, materials, tools, equipment, and supervision required for its electrical construction scope.
- The work included electrical demolition, conduit, wiring, boxes, devices, switchgear, and final electrical connections.
- ESD furnished and installed the electrical equipment rack, electrical disconnect, and instrumentation LIT termination box.
- The project included excavation and installation of a concrete-encased electrical ductbank serving the new water-storage and pumping facilities.
- ESD coordinated electrical materials and equipment furnished by Johnston Construction Company and other project suppliers.
- The work included limited instrumentation terminations and electrical interfaces associated with the new water-storage system.
- ESD supported electrical inspections, startup, testing coordination, operation and maintenance documentation, and preparation of record drawings.
- Electrical Services Division, LLC completed the electrical portion of the Greenbrier Water Storage Tank project at 47314 Green Leaf Road in Lexington Park, Maryland.
- The overall project included construction of a new 218,000-gallon water-storage tank, yard piping, stormwater-management improvements, sediment and erosion controls, a new 500-GPM booster pumping station, piping and valves within the water station, and electrical and SCADA upgrades.
- ESD’s work supported the electrical infrastructure required for the new water-storage and pumping facilities.
- The electrical scope included demolition of designated existing electrical components and preparation of affected systems for the new construction.
- ESD coordinated shutdowns and disconnections with Johnston Construction Company to ensure that existing systems were made safe before removal or modification.
- Electrical equipment and circuits designated to remain were protected throughout construction.
Project Description
Johnston Construction Company completed the Greenbrier Water Storage Tank project for the St. Mary’s County Metropolitan Commission.
The project included installation of a new 218,000-gallon water-storage tank and the associated structural, mechanical, electrical, instrumentation, and site improvements.