LocationCalifornia, St. Mary's County, Maryland
MarketWater Storage and Tanks
Contract details
- Johnston Construction Company — Contract
- $2,153,533
- Concrete Services Division — Contract
- $94,309
Team Members
- Owner
- St. Mary’s County Metropolitan Commission
- Engineer
- St. Mary’s County Metropolitan Commission, Chief Engineer
- Prime Contractor
- CB&I LLC
- Civil Subcontractor
- Johnston Construction Company
Key Accomplishments
Johnston Construction Company
- The company furnished licensed surveying and construction layout services required for the project.
- JCC documented existing conditions through preconstruction video and provided progress photographs and time-lapse project documentation.
- The company installed and maintained erosion and sediment-control measures and coordinated compliance activities with the applicable inspection agencies.
- JCC performed site clearing, grading, earthwork, and general civil-site construction supporting the new elevated water tank and water station.
- The work included clearing Lot No. 2 and constructing a temporary access road from Amber Drive to support project traffic, material delivery, and construction operations.
- JCC coordinated its work with CB&I’s specialized composite-tank foundation, pedestal, steel-tank, painting, and tank-construction activities.
- The company performed mechanical work associated with the water station, including piping, valves, fittings, equipment connections, supports, and associated appurtenances within its assigned scope.
- JCC supported installation of the water-station systems located within the concrete tank support column.
- The mechanical and process work coordinated the new well source with the elevated storage tank, water-distribution system, disinfection equipment, metering systems, and station controls.
- JCC performed electrical work supporting the new water tower, well station, process equipment, lighting, electrical distribution, standby-power system, and associated site improvements.
- The company installed electrical raceways, conductors, boxes, cabinets, wiring devices, grounding and bonding components, panelboards, disconnects, starters, and associated electrical equipment within its assigned scope.
- JCC performed instrumentation and control work supporting operation and monitoring of the new water station.
Concrete Services Division
- Concrete Services Division performed the concrete-forming, placement, finishing, and curing work supporting construction of the Hickory Hills Water Tower and Well project.
- CSD furnished the labor, formwork materials, tools, equipment, concrete-finishing supplies, curing materials, and accessories required for its assigned work.
- The company performed concrete work for the new two-million-gallon composite elevated water-storage tank and associated water-station improvements.
- CSD formed and placed concrete for the elevated-tank foundation, including curved and straight wall sections associated with the specialized composite tank structure.
- The company formed and placed the tank floor slab, including the integral curb and associated concrete finishes.
- CSD constructed the reinforced-concrete generator pad and transformer pad supporting the project’s permanent electrical and standby-power systems.
- The work included forming and placing the end wall and two level spreaders associated with the site-drainage and stormwater-management improvements.
- CSD formed and placed the tank overflow splash block to protect the surrounding site from erosion during overflow events.
- The company constructed equipment pads required for the water-station mechanical, electrical, and instrumentation systems.
- CSD formed and placed the concrete antenna foundation included in its assigned scope.
- The company installed and stripped slab-on-grade, curved-wall, and straight-wall formwork.
- CSD placed approximately 296 cubic yards of concrete and coordinated concrete deliveries, testing, and pumping services provided through Johnston Construction Company.
- The company completed floating, screeding, machine troweling, pointing, patching, curing, and protection of the concrete surfaces.
- CSD installed vapor barriers, premolded joint materials, saw-cut joints, joint sealants, mesh, dowels, and concrete accessories within its scope.
Project Description
Johnston Construction Company performed the civil, mechanical, electrical, and instrumentation portions of the Hickory Hills Water Tower and Well project as a subcontractor to CB&I LLC.
JCC supported construction of a new two-million-gallon composite elevated water-storage tank and associated water station for the St. Mary’s County Metropolitan Commission.