Markets Served / Project Experience

Huntingdon Wastewater Treatment Plant – 2,000-Gallon Diesel Tank Certification

Huntingdon, Pennsylvania 16652

LocationHuntingdon, Pennsylvania 16652
MarketIndustrial and Environmental

Contract

Amount not specified in the supplied project record.

Team Members

Owner
Huntingdon Borough
Prime Contractor
Johnston Construction Company

Key Accomplishments

  • JCC's certification work concerned a 2,000-gallon, double-wall, unprotected steel aboveground storage tank used for diesel fuel storage at the municipal wastewater treatment facility.
  • Completed the tank certification assignment under a time-and-material arrangement with Huntingdon Borough, supporting the facility's storage tank documentation requirements.
  • The existing aboveground storage tank was identified as a 2,000-gallon, double-wall steel tank designed for diesel fuel storage. The double-wall configuration provides an additional containment boundary around the primary storage vessel. Johnston Construction Company's assignment concerned the installation certification of this existing tank within the operating wastewater treatment facility.
  • The certification project formed part of the facility's ongoing storage tank documentation and maintenance requirements. Johnston Construction Company's responsibilities were associated with the certification of the previously installed equipment. The available project records do not identify any additional tank installation, replacement, or modification work performed under this assignment.
  • The project was managed by Johnston Construction Company's Project Manager John Lewis, with John Buskirk identified as the representative for Huntingdon Borough. The work was performed under a time-and-material arrangement and is recorded as complete in the company's historical project database.
  • Through this specialized assignment, Johnston Construction Company demonstrated its experience with aboveground storage tank installations and certification services associated with municipal wastewater treatment facilities.

Project Description

Johnston Construction Company served as Prime Contractor for the certification of an existing 2,000-gallon aboveground diesel storage tank at the Huntingdon Wastewater Treatment Plant in Huntingdon, Pennsylvania.

Undertook a specialized tank installation certification assignment associated with equipment previously installed during the wastewater treatment plant's 2010 facility upgrade.