LocationLewes, Delaware
MarketWater Storage and Tanks
Contract details
- Johnston Construction Company — Contract
- $1,661,223
- Concrete Services Division — Contract
- $53,072
- Electrical Services Division — Contract
- $277,573
Team Members
- Owner
- Lewes Board of Public Works
- Prime Contractor
- CB&I Storage Tank Solutions, LLC
- Civil Subcontractor
- Johnston Construction Company
- Engineer
- George, Miles & Buhr, LLC
Key Accomplishments
Johnston Construction Company
- Coordinated pile installation, geotechnical oversight, static-load testing, foundation excavation, reinforcing steel, concrete placement, backfill, and final slab construction.
- Furnished and installed the interior piping serving the elevated tank, including piping connections and appurtenances required for complete tank operation.
- Installed the buried water-main system, wet-tap connection, fire hydrant, and associated valves and fittings.
- Furnished and installed a tank-overflow Tideflex valve and coordinated the overflow connection with the tank manufacturer.
- Installed a concrete access ramp and an overflow swale with riprap protection.
- Furnished and installed electrical ductbanks, conduit, conductors, distribution equipment, lighting, receptacles, obstruction lighting, grounding, and equipment connections.
- Provided electrical power and control infrastructure for the tank systems, instrumentation, motor-operated equipment, and site facilities.
- Furnished and installed instrumentation and controls associated with the tank, including the control panel and coordination with the Owner’s SCADA system.
- Installed unit heaters and a sump pump within the base of the elevated storage tank.
- Installed a suspended drop ceiling within the base of the tank and coordinated ceiling support requirements with CB&I.
- Coordinated construction sequencing with the elevated-tank erection, coating, electrical, controls, piping, and site-work activities performed by the various project participants.
- Johnston Construction Company performed the civil, mechanical, electrical, and instrumentation scope for the Lewes Elevated Storage Tank project in Lewes, Delaware.
Concrete Services Division
- Concrete Services Division, LLC performed the concrete forming, placement, finishing, and curing work associated with the new Lewes Elevated Storage Tank.
- Performed concrete work for the elevated-tank foundation, floor slab, door-access ramp, pipe-support pads, and transformer pad.
- Installed and stripped the formwork required for the tank foundation, including slab-on-grade forms, curved-wall forms, and straight-wall forms.
- Coordinated the placement of approximately 106 cubic yards of concrete for the foundation and associated structures.
- Formed approximately 792 square feet of curved foundation wall and approximately 36 square feet of straight-wall construction.
- Formed approximately 64 square feet of slab-on-grade construction for the tank foundation and related concrete improvements.
- Placed concrete for the tank foundation walls and slab-on-grade areas in accordance with the tank-foundation drawings and project specifications.
- Floated and screeded approximately 805 square feet of concrete surfaces.
- Performed pointing and patching of approximately 828 square feet of formed concrete surfaces.
- Installed concrete accessories including premolded joint material, waterstops, caulking, and related components furnished by Johnston Construction Company.
- Coordinated reinforcing-steel placement, unloading of reinforcing materials, setting of anchor bolts, and installation of embedded items when requested by JCC.
- Constructed three concrete pipe pads and installed twenty dowels associated with the concrete work.
- Coordinated concrete deliveries, concrete-pumping services, testing-laboratory activities, and construction equipment provided by Johnston Construction Company.
- Performed winter-protection labor and coordinated the placement of blankets and heaters furnished by JCC when required.
Electrical Services Division
- Electrical Services Division, LLC performed the electrical construction associated with the new Lewes Elevated Storage Tank.
- Furnished the labor, materials, tools, equipment, and supervision required for the electrical work included in Divisions 16 and 17 of the project specifications.
- Installed conduit, conductors, boxes, wiring devices, supports, terminations, and electrical equipment connections throughout the tank site.
- Furnished and installed the electrical-service equipment, including the utility meter, 200-amp main circuit breaker, 200-amp Panel PP1, surge-protection device, disconnects, and Hand-Off-Automatic switch.
- Installed the main electrical disconnect rack and coordinated its location with the tank, underground utilities, and site improvements.
- Furnished and installed twelve Type A fixtures, one Type B fixture, four pole-mounted Type SA site lights, and one obstruction-lighting system with its associated panel.
- Constructed the concrete bases required for the exterior site-lighting poles.
- Installed electrical grounding and bonding, including a grounding ring, ground rods at four locations, and connections to the base of the elevated tank and main disconnect rack.
- Installed six 6-inch conduits through the tank foundation for future antenna-related use.
- Installed a 2-inch conduit extending up the tank for the antenna cable furnished by others.
- Performed trenching, excavation, and backfilling required for the electrical service, grounding ring, gate-related conduit, site lighting, and other electrical raceways within ESD’s scope.
- Coordinated direct-buried conduit and underground electrical routing with Johnston Construction Company’s grading, water-main, stormwater, paving, and site-restoration work.
- Installed low-voltage power conductors, control-voltage cables, raceways, boxes, wiring devices, circuit protection, panelboards, and lighting systems in accordance with the project specifications.
- Coordinated electrical connections with equipment and materials furnished by Johnston Construction Company, CB&I, the utility provider, and other project participants.
Project Description
Johnston Construction Company performed the civil, mechanical, electrical, and instrumentation construction associated with a new one-million-gallon elevated water storage tank for the Lewes Board of Public Works.
Constructed the reinforced-concrete foundation and floor slab supporting the new elevated storage tank.