LocationAberdeen, Harford County, Maryland
MarketPump Stations
Contract details
- Johnston Construction Company — Contract
- $1,681,891
- Concrete Services Division — Contract
- $23,792
- B & R Electrical Contractors — Contract
- $79,974.40
Team Members
- Owner
- City of Aberdeen
- Prime Contractor
- Johnston Construction Company
- Engineer
- ARRO Consulting, Inc.
Key Accomplishments
Johnston Construction Company
- Furnished and installed a new prefabricated booster-pump station containing three pumping units and the associated mechanical, electrical, and control systems.
- Constructed the station foundation and coordinated the setting, anchorage, and connection of the prefabricated pumping facility.
- Installed the suction and discharge piping, valves, fittings, supports, pressure instrumentation, and appurtenances required for the complete pumping system.
- Connected the new booster station to the City’s existing water-distribution system.
- Installed yard piping, water-main valves, restrained fittings, valve boxes, and associated underground utility components.
- Coordinated water-service shutdowns, tapping operations, pressure testing, leakage testing, flushing, disinfection, and return to service.
- Furnished and installed variable-frequency drives and automatic controls to regulate pump operation based on system pressure and water demand.
- Provided suction- and discharge-pressure monitoring with adjustable alarm and shutdown setpoints to protect the pumps and distribution system.
- Programmed automatic pump alternation and transfer of operation to the next available pump in the event of equipment failure.
- Installed electrical service equipment, power distribution, control panels, raceways, conductors, grounding, and equipment connections for the booster station.
- Furnished and installed a diesel-engine-driven standby generator to maintain station operation during interruptions of normal electrical power.
- Coordinated generator controls, starting equipment, weather-protective enclosure, fuel system, electrical connections, testing, and startup.
Concrete Services Division
- Concrete Services Division, LLC performed the concrete forming, placement, finishing, curing, and accessory work associated with construction of the Long Drive Booster Pump Station.
- Furnished the labor, form materials, tools, equipment, supplies, and supervision required for the concrete work included in CSD’s subcontract.
- Mobilized and demobilized concrete-forming equipment, tools, materials, and supplies to and from the project site.
- Furnished and installed approximately 516.63 square feet of footing formwork.
- Furnished and installed approximately 225.21 square feet of slab-on-grade formwork.
- Furnished and installed approximately 30 square feet of column formwork.
- Furnished and installed approximately 30.83 square feet of bulkhead formwork.
- Furnished and installed approximately 73.42 square feet of concrete boxout formwork.
- Coordinated concrete foundation penetrations, electrical conduit stub-ups, process-piping openings, and other embedded items with Johnston Construction Company and the project trades.
- Placed approximately 48.31 cubic yards of slab-on-grade concrete.
- Placed approximately 0.42 cubic yards of column concrete.
- Floated and screeded approximately 925.97 square feet of concrete surfaces.
- Performed pointing and patching on approximately 30 square feet of completed concrete surfaces.
- Provided curing labor and materials for approximately 1,802.06 square feet of concrete.
B & R Electrical Contractors
- B & R Electrical Contractors, Inc. performed the site and equipment electrical work associated with construction of the Long Drive Booster Pump Station.
- Furnished labor, materials, tools, and supervision for the electrical work identified in the project plans, specifications, Addendum No. 1, and BRE’s proposal.
- Installed electrical conduit, conductors, boxes, devices, and equipment connections required for the portions of the booster-station electrical system assigned to BRE.
- Installed the electrical service disconnect and current-transformer cabinet serving the new booster-pump facility.
- Coordinated the service entrance location and completed the required building penetration and sleeve before installation of the exterior masonry.
- Installed underground electrical raceways serving the utility transformer, standby generator, and antenna pad.
- Performed excavation, bedding, conduit installation, backfilling, and compaction for the electrical ductbank and direct-burial raceway systems within BRE’s scope.
- Installed two additional 4-inch PVC conduits, approximately 150 linear feet each, for the utility company’s primary electrical service.
- Installed the additional primary-service conduits as direct-burial raceways without concrete encasement.
- Installed Schedule 40 PVC conduit for exposed and underground electrical raceways, together with galvanized rigid-steel nipples through the concrete slab where required.
- Furnished and installed power conductors and control wiring for the electrical systems assigned to BRE.
- Completed limited electrical connections among the standby generator, automatic transfer switch, RTU panel, and electrical service.
- Installed grounding for the booster-station building, electrical service, and antenna system.
- Installed grounding electrodes at the building corners and coordinated grounding and bonding with the service and equipment.
Project Description
Johnston Construction Company served as the prime contractor for construction of the Long Drive Booster Pump Station for the City of Aberdeen.
JCC completed the work under Contract No. 22-07