LocationOcean City, Worcester County, Maryland
MarketWastewater Treatment Plants
Contract
$55,672
Team Members
- Owner
- Les Industries Fournier, Inc.
- Prime Contractor
- Johnston Construction Company
- Subcontractor
- Bilbrough's Electric, Inc.
Key Accomplishments
- Installed the new rotary press without disassembly and grouted the equipment base.
- Connected the new press chute and adapter to the existing sludge conveyor system.
- Installed the rotary press motor, which was shipped separately from the equipment.
- Installed the new mixed-sludge header and connected it to the existing process piping.
- Connected the press wash-water system to furnished stainless-steel flexible connections.
- Installed two 4-inch flanged strainers, including JCC-supplied piping and fittings.
- Furnished and installed two saddles and 1-inch valves on the wash-water header to accommodate future process channels.
- Connected the new equipment drain and capped the existing drain connection.
- Connected air tubing to the existing plant compressed-air system.
- Removed two existing polymer pumps and installed two new Fournier-supplied polymer pumps.
- Coordinated electrical demolition, reconnection, control-panel work, polymer-pump connections, and rotary-press motor/control wiring.
- Integrated the replacement equipment into the existing wastewater treatment process while coordinating mechanical and electrical work within the operating facility.
Project Description
Completed replacement and installation of a Fournier Rotary Press sludge-dewatering system at the Ocean City Wastewater Treatment Plant.
Unloaded the new rotary press and removed the existing press intact for return transportation.