Park Water Plant Flow Meter Replacement

Salisbury, Wicomico County, Maryland

LocationSalisbury, Wicomico County, Maryland
MarketWater Treatment Plants

Contract details

Johnston Construction Company — Contract
$258,318
B & R Electrical Contractors — Contract
$15,870

Team Members

Owner
City of Salisbury, Maryland
Engineer
City of Salisbury Department of Infrastructure and Development
Prime Contractor
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • The company furnished and installed a 16-inch bypass water main around the new meter vault to maintain operational flexibility during construction and future maintenance.
  • The bypass system included 20-inch-by-16-inch tapping saddles, 16-inch tapping valves, ductile-iron piping, fittings, bends, and associated connections to the existing water system.
  • JCC installed new 16-inch isolation valves and 20-inch-by-16-inch reducers to connect the meter vault piping to the existing transmission main.
  • The project included removal of the existing flow meter and installation of new 20-inch piping and fittings to restore the existing water-main configuration.
  • JCC coordinated planned shutdowns, tapping operations, piping connections, and system transitions with City of Salisbury Water Works personnel to maintain dependable water-service operations.
  • The company installed electrical power and signal wiring between the new flow meter and the Park Water Treatment Plant for meter operation, monitoring, and communication.
  • JCC furnished and installed a vault drainage system that included a sump, sump pump, discharge piping, electrical service, and dry well.
  • The work included installation of one-inch polyethylene tubing between the flow meter vault and treatment plant to support water-sampling operations.
  • JCC provided excavation, trench support, dewatering, bedding, backfill, concrete, utility coordination, and restoration required to complete the underground work.
  • The company coordinated temporary maintenance of plant flows and existing stormwater drainage throughout construction.
  • JCC completed equipment installation, electrical terminations, system testing, operational verification, as-built documentation, cleanup, and final site restoration.
  • Johnston Construction Company performed the Park Plant Flow Meter Replacement project for the City of Salisbury at the Park Water Treatment Plant in Salisbury, Maryland.

B & R Electrical Contractors

  • B & R Electrical Contractors performed the electrical work supporting installation of a new 16-inch magnetic flow meter and precast concrete meter vault at the City of Salisbury’s Park Water Treatment Plant.
  • BRE furnished the conduit, wire, boxes, devices, connections, and related electrical materials required for the new flow-meter installation.
  • The company installed power conduit and wiring serving the magnetic flow meter, flow-meter transmitter, sump pump, and receptacles within the meter vault.
  • BRE installed signal wiring between the magnetic flow meter, transmitter, and treatment-plant building to support flow monitoring and instrumentation functions.
  • The company routed the flow-meter and receptacle conduit and wire to the building near the existing electrical service panel.
  • BRE coordinated its connections to the flow meter and transmitter furnished by others.
  • The work included underground electrical conduit and ductbank installation between the flow-meter vault and the Park Water Treatment Plant building.
  • BRE performed the electrical excavation required for the underground conduit and ductbank system.
  • The company furnished and installed electrical boxes, devices, pull points, conduit fittings, and associated components required for the completed installation.
  • BRE coordinated its electrical work with JCC’s meter-vault construction, water-main piping, bypass piping, isolation-valve installation, sump system, and site work.
  • The company obtained the electrical permit required for its portion of the project.
  • BRE reviewed and submitted required product information and operations and maintenance documentation for materials within its scope.
  • The work included startup support and verification of the electrical connections serving the flow meter, transmitter, sump pump, and vault receptacles.
  • BRE prepared as-built and record drawings documenting the completed electrical installation.

Project Description

Johnston Construction Company served as the prime contractor for the installation of a new 16-inch magnetic flow meter and associated improvements at the City of Salisbury’s Park Water Treatment Plant.

JCC installed the new magnetic flow meter within a precast concrete flow meter vault complete with process piping, isolation valves, access components, drainage provisions, and required appurtenances.