Markets Served / Project Experience

S.E. Milford 0.75 MG Spheroidal Elevated Water Storage Tank

Milford, Sussex County, Delaware

LocationMilford, Sussex County, Delaware
MarketWater Storage and Tanks

Contract details

Johnston Construction Company — Contract
$640,728
Concrete Services Division — Contract
$27,110
Electrical Services Division — Contract
$40,087

Team Members

Owner
City of Milford
Engineer
Davis, Bowen & Friedel, Inc.
Prime Contractor
CB&I Inc. / Chicago Bridge & Iron
Civil Subcontractor
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • Completed site clearing, grading and general site development required to prepare the elevated-tank site for foundation and infrastructure construction.
  • Performed construction surveying and layout to establish the tank foundation, site improvements, piping and associated project features.
  • Removed and disposed of existing site debris encountered within the project area as part of site preparation.
  • Constructed the tank's auger-cast pile foundation system, providing deep-foundation support for the new elevated water storage tank.
  • Coordinated and performed required pile testing and foundation verification associated with the elevated-tank foundation system.
  • The project specifications required the pile-supported tank foundation to incorporate a reinforced-concrete cap foundation, with pile design developed to support the tank, stored water and associated appurtenances.
  • Auger-cast pile construction utilized the specified continuous-flight hollow-stem-auger installation method, with high-strength grout placed as the auger was withdrawn from the bearing stratum.
  • The auger-cast pile specification required minimum 4,000-psi grout and placement of reinforcement into the fresh pile grout following pile installation.
  • Installed CB&I-furnished tank foundation anchor bolts, coordinating the tank-support interface with the foundation concrete and tank erection requirements.
  • Performed structural concrete construction at the tank base, supporting the pile-foundation and elevated-tank structural system.
  • Completed the overflow splash pad and associated drainage/restoration work required at the tank site.
  • Installed water-system piping associated with the elevated tank, including watermain, valves, fittings and hydrant-related work within JCC's civil/mechanical package.

Concrete Services Division

  • Concrete Services Division, LLC served as Trade Subcontractor to Johnston Construction Company for the concrete portion of the foundation supporting the new 750,000-gallon S.E. Milford Elevated Storage Tank.
  • Furnished the labor, materials, tools and concrete-construction resources required for forming and concrete placement of the elevated-tank foundation in accordance with the project drawings, specifications and CB&I foundation requirements.
  • Mobilized and demobilized concrete equipment, tools and supplies required to execute the foundation-concrete package.
  • Furnished form materials and lumber and performed installation and stripping of concrete forms for the tank-foundation construction.
  • The subcontract billing schedule identified approximately 913 square feet of foundation formwork, including footing, slab-on-grade and substantial curved-wall forming.
  • Formed approximately 792 square feet of curved foundation wall, representing the largest individual formwork component identified in CSD's pricing schedule.
  • Performed concrete-placement labor for approximately 84 cubic yards of foundation concrete, including wall and slab-on-grade construction.
  • The foundation-concrete schedule included approximately 74.5 cubic yards of wall concrete, together with slab-on-grade placements associated with the tank foundation.
  • Completed concrete-finishing operations incorporating float/screed finishing, machine-trowel finishing, point-and-patch work and bag finishing.
  • Performed concrete curing across approximately 1,960 square feet of completed concrete surfaces.
  • Furnished labor and materials for concrete accessories including waterstop, caulking, vapor barrier, premolded joint material, saw-cut joints and joint sealing.
  • Performed reinforcing-steel placement, with the subcontract billing schedule identifying approximately 3.67 tons of reinforcing steel within the foundation-concrete work.
  • Provided associated reinforcing-mesh placement and concrete reinforcement support as part of the structural foundation package.
  • Coordinated concrete construction around the project's auger-cast pile foundation system, including pile-top chipping where required to prepare the deep-foundation interface for subsequent concrete work.

Electrical Services Division

  • Electrical Services Division, LLC served as Trade Subcontractor to Johnston Construction Company for the electrical portion of the new 750,000-gallon S.E. Milford Elevated Storage Tank in Milford, Delaware.
  • Furnished the labor, materials and tools necessary for the electrical construction package associated with the elevated water-storage facility.
  • Installed extensive electrical conduit, wire and equipment connections required throughout the tank-site electrical system.
  • Furnished and installed lighting, switches and receptacles serving the elevated-storage-tank facility.
  • Installed the project's LP panelboard and surge-protection unit, providing distribution and protection for the tank-site electrical system.
  • Furnished and installed electrical boxes and devices as part of the complete electrical package.
  • Performed work associated with switchgear installation and electrical distribution for the elevated-tank site.
  • Installed the specified ground ring at the base of the tank, providing the grounding infrastructure associated with the electrical installation.
  • Coordinated electrical installations with JCC's civil construction, tank-foundation work and CB&I's elevated-tank construction.
  • Performed electrical work within a site containing major civil, structural, water-piping and elevated-tank construction, requiring close coordination of conduit routing, equipment locations and installation sequencing.
  • Obtained and coordinated the required electrical permit associated with ESD's work.
  • Mobilized and demobilized electrical tools, equipment and supplies required for performance of the subcontract.
  • Reviewed required electrical submittals and operation-and-maintenance documentation associated with the installed equipment.
  • Coordinated electrical materials furnished by other project participants so equipment and electrical interfaces could be incorporated into ESD's installation.

Project Description

Johnston Construction Company served as Civil Subcontractor to CB&I for construction of the new 750,000-gallon S.E. Milford Elevated Storage Tank in Milford, Delaware. The overall project included the elevated tank, pile foundation, water piping, electrical systems, coatings and associated site improvements.

Performed a broad civil, mechanical and electrical support package for the tank project, integrating foundation construction, site development, piping, electrical work and restoration under a single subcontract.