Washington Township WWTP Sequencing Batch Reactor Valve Replacement

Waynesboro, Franklin County, Pennsylvania

LocationWaynesboro, Franklin County, Pennsylvania
MarketWastewater Treatment Plants

Contract details

Johnston Construction Company — Contract
$918,587
B & R Electrical Contractors — Contract
$19,277

Team Members

Owner
Washington Township Municipal Authority
Engineer
GHD
Prime Contractor
Johnston Construction Company

Key Accomplishments

Johnston Construction Company

  • The work included replacement of decanting mechanisms, sludge-wasting pumps, process piping, electrical controls, disconnect switches, and junction boxes.
  • JCC installed new manual isolation valves on the SBR influent and decant piping to improve future operational control and maintenance access.
  • The company coordinated the rehabilitation of one SBR tank at a time so the remaining tank could continue treating wastewater during construction.
  • JCC furnished and operated temporary bypass-pumping systems where required to maintain continuous wastewater-treatment operations.
  • The project included removal, pumping, hauling, and disposal of light sludge, grit, debris, and accumulated material from the existing SBR tanks.
  • JCC constructed new internal baffle walls and installed new interior and exterior process piping.
  • The company coordinated inspection of the existing mixers and aeration grids by the treatment-system manufacturer while each tank was drained.
  • JCC installed electrical wiring, controls, disconnects, junction boxes, and actuator connections supporting the replacement valves and process equipment.
  • The company completed equipment testing, operational verification, manufacturer startup, staff instruction, painting, cleanup, and final restoration.
  • Johnston Construction Company performed the WWTP SBR Valve Replacement project for Washington Township Municipal Authority at its wastewater-treatment facility in Waynesboro, Pennsylvania.
  • The project rehabilitated critical process equipment associated with two existing sequencing batch reactor tanks.
  • Sequencing batch reactors treat wastewater through controlled filling, aeration, settling, decanting, and sludge-removal cycles within the same basin.

B & R Electrical Contractors

  • B & R Electrical Contractors performed the electrical modifications supporting the rehabilitation of two existing sequencing batch reactor tanks at the Washington Township wastewater-treatment plant.
  • BRE disconnected existing electrical equipment and reconnected the replacement decanting mechanisms, motor-operated valves, electrically actuated plug valves, and associated process equipment.
  • The company extended existing conduits and field wiring where required to accommodate the replacement equipment.
  • BRE furnished and installed ten NEMA 4X disconnect switches suitable for the wastewater-treatment environment.
  • The disconnect installation included four units serving the decanting mechanisms, four units serving motor-operated valves, and two units serving electrically actuated plug valves.
  • BRE coordinated 480-volt power connections for the influent plug-valve actuators and 115-volt power connections for the decant and air-valve actuators.
  • The company installed conduit, wire, boxes, devices, switchgear components, and equipment connections required by the project drawings and specifications.
  • BRE coordinated electrical work with JCC’s phased rehabilitation of one SBR tank at a time so the second tank could remain operational.
  • The work included electrical submittals, shop drawings, spare parts, operations and maintenance information, as-built records, startup support, and instruction to operating personnel.
  • BRE performed the electrical installation in accordance with Pennsylvania prevailing-wage requirements and the project’s steel-product procurement provisions.
  • B & R Electrical Contractors, Inc. performed the electrical portion of the Washington Township WWTP SBR Valve Replacement project in Waynesboro, Pennsylvania.
  • The overall project rehabilitated critical treatment equipment within two existing sequencing batch reactor tanks at the Washington Township Municipal Authority wastewater-treatment plant.
  • The work included replacement of process valves and actuators, decanting mechanisms, sludge-wasting pumps, process piping, internal baffles, electrical connections, temporary bypass pumping, tank cleaning, grit removal, testing, and startup.
  • Washington Township Municipal Authority served as the Owner.

Project Description

Johnston Construction Company served as the prime contractor for the replacement and modification of critical process equipment within two existing sequencing batch reactor tanks.

JCC removed and replaced electrically actuated influent, decant, and air-system valves serving the wastewater-treatment process.